Wet coating

  • The dimensions of the coating shop are 60 x 30 m
  • 2 portal cranes with the loading capacity of 10 tons
  • The air temperature during the process of coating is 15 – 18 °C and during the process of drying it is 20 – 40 °C
  • Thermo ventilation units with heat recovery and switching between coating and drying modes
  • Possibility of coating oversized constructions (up to 60 tons)

Usage:

  • Surface protection of metal constructions, machinery, pipelines, external and internal surfaces of tanks, steel halls, radiators, wheel discs

Anti-corrosion coatings of large tanks